Projects
- Kesrouane Coastal Area
- Yammouneh West Bekaa
- Bmariam Falougha - Matn
- Souk Al Gharb - Matn
- Akkar North
- Akkar Al Attika North
- Fakher-Al-Dine Valley Nabatieh
- Al-Taybeh South
- Al-Dannieh Meniyeh North
- Aramoun
- Ibel El Saki South
- Lucy West Bekaa
- Ain Kssour
- Mazraat Yachou Matn
- Matn Pumpsets Supply and Installation
- Matn Pumping Stations Maintenance
- Jeita Dbayeh
- Main Transmission Network
- Distribution Network
Use: Potable Water
Financing: Japan
Official Development Assistance Client: Ministry of Energy & Water
Employer: Council For Development & Reconstruction (CDR)
Contract value: US $ 48 million
Contractors:
- Dar al Handasah
- Nazih Taleb & Partners – Lebanon
- M.W.H. Montgomery Watson Harza – UK
Constructors:
- Baresel AG – Germany (joint venture)
- Tajj Est. – Lebanon (joint venture)
General Characteristics:
The project involves Hydraulic and Civil Works to draw Potable and Irrigation water from al Madiq spring (Naher Ibrahim) to cities and villages of the Kesrouane Coastal and Eastern areas. It covers cities as Akaibi, bouar, Assafra, tabarja, Jouneih, Zouk Mossbeh, Adma, Kfarahbab, Sahel Alma, Haret Sakher, Harissa, Ghosta.
Works Comprises:
- 120 Kms of Main Transmission popes as well as water distribution networks.
- A Tunnel, 4Kms long and 3.8 meters in diameter will be excavated in predominately Karstic limestone formations utilizing a Robbins T.B.M. – An unprecedented use in Lebanon – Upon completion of excavation and ground support of the tunnel, water pipes will be installed and laid to convey the potable water from Al Madiq Spring to the Kesrouane Area.
- The Construction and Rehabilitation of existing facilities: Reservoirs, wells, pumping stations, as well as the construction of all related mechanical and electrical installations.
- The Drilling and Equipping of the wells in the river of the Naher Ibrahim as well as the rehabilitation of the Madiq Spring Catchment.
Use: Potable water
Financing: Islamic Bank, Council For Development & Reconstruction (CDR)
Clients: Islamic Bank, Council For Development & Reconstruction (CDR)
Contract value: US $ 11.965 million
Contract year: 1999 – 2002
The Project:
Work involved the conveying of water from Moughar & Toufaha springs to all villages from the north of Bteday to the south of Tamnine al Tahta.
It required a Water Treatment station with a pressurized rapid sand filter system.
Two stations were constructed:
Station 1: 4 Tanks
Capacity: 650 m3/hour
Station 2: 1 Tank
Capacity: 60 m3/hour
Other characteristics:
- 23 Reservoirs.
- 2 Boosters.
- 74 kms of Transmission land pipelines of ductile iron ranging from 4 inches up to 16 inches.
- 206 kms of Distribution Networks to draw water from Tamnin, Shamstar & Bednayel boreholes to respectively Tamnin, Shamstar & Bednayel Reservoirs.
300 kms of Distributaries:
- With 1.5, 2, 3, 4, 5, 6 & 10 inches in diameter.
- Chlorination system,Electronic telemetry incorporating radio & microwave components. -SCADA-
Use: Potable water
Financing: Ministry of Energy & Water, Central Fund for the Deplaced
Clients: Ministry of Energy & Water, Central Fund for the Deplaced
Contract value: US $ 11.009 million
Contract year: 1995 – 2001
The Project:
To supply all villages in the high Metn district with drinkable water.
Works & all associated structures were taken for conveying water from Bmariam wells to Falougha reservoirs.
It required the installation of 30 kms of land pipelines of ductile iron of different dimensions up to 12 inches in diameter.
Other characteristics:
- 3 Reservoirs.
- 3 Pumping Stations.
- 3 Boreholes.
- Administrative buildings.
- Hydro-mechanical facilities.
- Controlling Panel Boards.
- Chlorination system.
- Electronic telemetry incorporating radio & microwave components.-SCADA-
Use: Potable water
Financing: Central Fund for the Deplaced
Client: Central Fund for the Deplaced
Contract value: US $ 11.56 million
Contract year: 1996 – 1999
The Project:
Works required:
- A Distribution system comprising main Transmission channels as well as Distributaries.
- 16 kms of land pipelines of ductile iron were installed to connect Dhour al Abadiyeh to the reservoir located at Radar Bayssour.
Distributaries were carried out to connect directly the main-transmission land pipelines to all Reservoirs.
10 kms of channels were installed.
All pipelines are respectively 4, 8, 12, 16, & 20 inches in diameter.
Use: Irrigation (agriculture)
Financing: Council For Development & Reconstruction
Client: Council For Development & Reconstruction
Contract value: US $ 8.0 million
Contract year: 2001 – 2003
The Project:
Works involved the conveying of water from 18 springs & rivers to irrigate a total area of 4500 hectares.
It required the construction of 160 kms of concrete channels.
Use: Potable water
Financing: Council For Development & Reconstruction
Client: Council For Development & Reconstruction
Contract value: US $ 4.0 million
Contract year: 2002 (Project under construction)
The Project:
Works involved the construction of:6 Reservations,3 Pumping Stations,3 Wells,70 kms of Distribution Networks.
Electronic telemetry incorporating radio & microwave components.-SCADA-
Use: Potable water
Financing: Council Of The South
Client: Council Of The South
Contract value: US $ 4.35 million
Contract year: 1994 – 1998
The Project:
The entire project was constructed in an impressive time frame of 45 days.
General characteristics:
- 2 Reservations.
- 6 Boreholes.
- 2 Pumping Stations.
- 9 Boosters.
Administrative buildings:
360 m2 & Hydro – mechanical facilities – Chlorination system.
Electronic telemetry incorporating radio & microwave components.-SCADA-
Use: Potable water
Financing: Council Of The South
Client: Council Of The South
Contract value: US $ 2.46 million
Contract year: 120 days
The Project:
The Project involved mainly the Rehabilitation of existing facilities:
- The Pumping Station on the Litani river increasing its capacity from 500 m3 to 10.000 m3 per day.
- The Water Treatment Station at Al Taybeh.
- The Transmission land pipelines linking the Pumping Station to the Water Treatment facility.
As well as the construction of a new road connecting Al Taybeh city to the Pumping Station.
The Project conveys Drinkable water to 30 cities & villages in the Jabal Amel area.
Other characteristics:
- 1 Reservoir.
- 1 Pumping Station.
- Chlorination system.
- Electronic telemetry incorporating radio & microwave components.-SCADA-
Use: Potable water
Financing: Ministry Of Energy & Water
Client: Ministry Of Energy & Water
Contract value: US $ 2.2 million
Contract year: 2001
The Project:
The Project involved the construction of:5 Reservoirs – Pre-stressed concrete / Ground level.
Ranging from 50 m3 to 200 m3 and located in the following villages: Deb’al, Kerhaya, Jayroun,Ras-el-Karem, Al Korn, A’ssyamout.
22000 L.M. of land pipelines of ductile iron and polyethylene, linking Ras el’Ain, Neb’eh El Kabir,& Neb’eh Al Abydine springs to the five Reservoirs.
18000 L.M. of Distributaries of polyethylene.
A network covering all villages mentioned above.
Electronic telemetry incorporating radio & microwave components.-SCADA-
Use: Potable water
Financing: Central Fund For The Displaced.
Client: Central Fund For The Displaced.
Contract value: US $ 1.23 million
Contract year: 1999 – 2001
The Project:
Involved the construction of:
1 Reservoir – Pre-stressed concrete / Ground level.
Capacity: 1000 m38 kms of main Transmission land pipelines of ductile iron – 20.5 kms of Distributaries of polyethylene.
Main pipelines & Dristubaries were installed to link the newly constructed Reservoir in Aramoun to the existing one in Baissour.
Electronic telemetry incorporating radio & microwave components.-SCADA-
Use: Potable water
Financing: World Bank
Client: World Bank
Contract value: US $ 545.400
Contract year: 1999 – 2001
The Project:
Involved the Rehabilitation of an existing Well, constructed in 1936, as well as the construction of a new one.
A Water Distribution System, was installed to cover the following villages: Al Khiyam, Ibel el Saki, Blat, Kley’a, Bourj el Moulouk, Jdeidat Marja’youn,Debbine, Der Mimass, Keferkella.
Other characteristics:
- 1 Reservoir.
- Pre-stressed concrete / Elevated Tank.
- Capacity: 500 m3.
- 2 Wells.
- 3 Pumping Stations were postponed.
- The Project has an actual capacity of 8600 m3/day & a potential one of 34400 m3/day.
Electronic telemetry incorporating radio & microwave components.-SCADA-
Use: Potable Water
Financing: UNICEF
Client: UNICEF
Contract value: US $ 712.000
Contract year: 1991
The Project:
Involved the construction of:
- 2 Reservoirs – Pre-stressed concrete / Elevated Tank.
- 2 Boreholes.
- 2 Booster pumps lifting 500 m3/hour to Sultan’s Y’akoub Reservoir.
Electronic telemetry incorporating radio & microwave components.-SCADA-
Use: Potable Water
Financing: Central Fund For The Displaced
Client: Central Fund For The Displaced
Contract value: US $ 395.000
Contract year: 2000 – 2001
The Project:
Involved the construction of:
- 1 Reservoir, Pre-stressed concrete / Ground level.
- Capacity: 300 m2.
- The installation of 1.5 kms of Main Transmission land pipelines of Font Ductile.
- 8.9 kms of Distributaries of Polyethylene.
- The network is connected to Ain Kssour’s Reservoir.
- Chlorination system.
Electronic telemetry incorporating radio & microwave components.-SCADA-
Use: Potable Water
Financing: Matn Water Authority
Client: Matn Water Authority
Contract value: US $ 600.000
Contract year: 2002 – 2003
The Project:
Work Involved the construction of:
- 1 Reservoir.
- Capacity: 1000 m3.
- 7 kms of land pipelines, (6 inches in diameter).
Use: Supply & Installation of Pumpsets
Financing: Matn Water Authority
Client: Matn Water Authority.
Contract value: US $ 220.000
Contract year: 2003
The Project:
Involved the supply & installation of:
Axial vertical pumps.
Flow: 200 m3/hour, Head: 550 m.
MATN / LEBANON
Use: Supply & Installation of Pumpsets
Financing: Matn Water Authority
Client: Matn Water Authority.
Contract value: US $ 270.000
Contract year: 2005
The Project:
Involved the supply & installation of:
Axial vertical pumps
Flow: 200 m3/hour, Head: 550 m
Booster sets
Flow: 54 m3/hour, Head: 150 m
Submersible moto pumpsets
Flow: 140 m3/hour, Head: 246 m
Use: Rehabilitation & Maintenance
Financing: Matn Water Authority
Client: Matn Water Authority
Contract value: US $ 500.000
Contract year: 2003 – 2004
The Project:
Rehabilitation of all pumpsets & panel boards at the following villages: Jeita,Kornet al Hamra, Mansourieh, and Bhannes.
Use: Drinkable water
Financing: Beirut Water Authority
Client: Beirut Water Authority
Contract value: US $ 225.000
Contract year: 2001
The Project:
Installation of electronic devices and flow meters in open channels, (flow rate, speed measurement..) at 9 points from Jeita grotto to Dbayeh’s water treatment plant & pumping station.
Use of Radio for data transfer to a SCADA system at Dbayeh.
Use: Drinkable water
Financing: Beirut Water Authority
Client: Beirut Water Authority
Contract value: US $ 210.000
Contract year: 2003 – 2004
The Project:
Installation of flow & pressure meters at 16 points, on the main transmission network of the Beirut Water Authority.
The new flow meters were integrated to the existing ones (previously installed).
Use of Radio for data transfer to the operator in Badaro.
Use: Drinkable water
Financing: Beirut Water Authority
Client: Beirut Water Authority
Contract value: US $ 1,188,000
Contract year: 2004 – 2005
The Project:
Installation of flow, pressure & level meters at 93 points, on the main distribution network of the Beirut Water Authority. it also includes the installation of motorized valves remotely operated.
This project also integrates previously installed meters and transmits data to SCADA installed in Badaro and five main stations by Radio transmission.